Nov 16, 2022
Hunan Broadcasting System Museum Published in ArchDaily China
Completed in November 2022, our design for a museum, frames the entry to a new campus designed by HPP Architects for Hunan Radio and Television's new Program Production Base. The 15,000 m2 / 150,000 SF, 6-level museum includes a range of gallery types and sizes to accomodate changing exhibitions. The building's double-layer fritted glass facade and cantilevred auditorium creates a dramatic presence, and it's mirrored canopy accentuates the campus's central pedestrian axis.
Read more on ArchDaily.